Backlog Maintenance/Rehabilitation

Rehabilitation goes further than spot improvement and entails a comprehensive overhaul of an existing road to extend its lifespan and improve its overall condition. This approach acknowledges that roads, like any infrastructure, require periodic maintenance to remain functional and safe.

Rehabilitation can involve resurfacing the road, repairing or replacing damaged pavement layers, enhancing drainage systems, and upgrading signage and road markings for improved visibility and safety. It often addresses the visible surface and underlying infrastructure that supports the road.

The goal of rehabilitation is to maximize the road’s longevity, ensuring it continues to serve its purpose effectively.

As a result, governments and authorities can save costs in the long run by proactively maintaining roads through rehabilitation as extensive reconstruction projects become less frequent. Rehabilitation is considered for the following reasons:

  1. Extended Lifespan: Rehabilitation can significantly extend the service life of an existing road, reducing the need for frequent reconstruction.
  2. Improved Condition: It can restore older roads to a good repair state, providing a smoother and safer driving experience.
  • Sustainability: Rehabilitation aligns with sustainability goals and minimizes resource use by revitalizing existing infrastructure.
  1. Cost Savings: Rehabilitation is often more cost-effective than full reconstruction when the road’s foundation is still sound.
S/No Intervention Type Name of Road Length
1BM/RH Phase 1)Waziri Estate- Hurumi – Gidan Faruku4.4
2BM/RH Phase 1)Abbattoir – Hurumi – Lukuyawa5.2
3BM/RH Phase 1)Gurmin Gawo – Garko – Mazangare – Kunkume6.4
4BM/RH Phase 1)Kauran Mido – Kaura Miyu – Sifawa4.8
5BM/RH Phase 1)Huchi – Gidan Kamba – Lugu Junction7.1
6BM/RH Phase 1)Wurno – Kwargaba – Sabon Gari9.5
7BM/RH Phase 1)Wurno – Tunga Kagara – Gidan Bango – Hamma Ali17.6
8BM/RH Phase 1)Goronyo – Kirare2.2
9BM/RH Phase 1)Prison Yard – Yagawal – Nabaguda – Dogon Daji23.4
10BM/RH Phase 2)Maikulki – Adarawa – Gbuji2.60
11BM/RH Phase 2)Gada – Gidan Hamma1.2
12BM/RH Phase 2)Gada – Gidan Isaka2.5
13BM/RH Phase 2)Kaffe – Rumbukawa – Gilbadi – Sakitawa – Gidan Yarfara Spur Dukamaje – Tsaro37.5
14BM/RH Phase 2)Tudun Madugu – Baredi2.1
15BM/RH Phase 2)Sabon Garin Liman – Gidan Magajiya3
16BM/RH Phase 2)Goronyo Main Road – Gorau1.4
17BM/RH Phase 2)Goronyo Main Road – Dawagari3.3
18BM/RH Phase 2)Gwadabawa – Chancha – Wadai Spur Illela Main Road8.7
19BM/RH Phase 2)Gwadabawa – Tungar Fulani – Kaime4.8
20BM/RH Phase 2)Gigane Main Road – Sakamaru – Labcedi1.4
21BM/RH Phase 2)Gwadabawa – Tsolawo4
22BM/RH Phase 2)Illela – Gidan Bango – Tudu Gudale- Masawa- Tabanni30
23BM/RH Phase 2)Rijiyar Mallam – Kukar Nadada-Gidan Abdulkarim4
24BM/RH Phase 2)Tudun Wada – Kuruje – Tikawa – Gumal6.6
25BM/RH Phase 2)Gatarawa – Tozai4.1
26BM/RH Phase 2)Modachi – Gazau Spur – Dan Zanke – Lugu5.5
27BM/RH Phase 2)Isa – Modachi – Bafarawa15
28BM/RH Phase 2)GGDAS junction – Bargaja – Katuru9.6
29BM/RH Phase 2)Yarbarade – Runji Kaji1.1
30BM/RH Phase 2)Tunga Junction – Tunga1.5
31BM/RH Phase 2)Mallamawa – Janrago1.6
32BM/RH Phase 2)Main Road – Ruggar Liman1.2
33BM/RH Phase 2)Hammaali – Siri Bado – Gandu2.7
34BM/RH Phase 2)Kware-Marbawa-Dangwaya6.2
35BM/RH Phase 2)Goronyo Main Road – Hamma Ali3.4
36BM/RH Phase 2)Illela Road – Jangebe – Buddau3.8
37BM/RH Phase 2)Bankanu – Rijiyar Kade3.7
38BM/RH Phase 2)Rabah Main Road – Gwaddadi1.4
39BM/RH Phase 2)Rabah Main Road – Rara2.3
40BM/RH Phase 2)Kurawa – Gatin Zago – Sabon Birni8
41BM/RH Phase 2)Yarbulutu – Tafkin Kanu – Alkalawa2.7
42BM/RH Phase 2)Shagari – Tureta main road-Kauran Marafa0.5
43BM/RH Phase 2)Silame road-Gumki-Karangiye-Buderi5.2
44BM/RH Phase 2)Katami Junction-Gadambe0.8
45BM/RH Phase 2)Betare-Rumbuki0.7
46BM/RH Phase 2)Katami-Birnin Tudu3.9
47BM/RH Phase 2)Jekanadu – Gabuwa2
48BM/RH Phase 2)Sanyinna-Buwade2.1
49BM/RH Phase 2)Tambuwal – Aljannaje1.5
50BM/RH Phase 2)Jega Road – Samo – Alasan7.9
51BM/RH Phase 2)Bye Pass – Shinfiri – Zomawa – Bashire10.6
52BM/RH Phase 2)Prison Yard – Yagawal – Nabaguda – Dogondaji23.4
53BM/RH Phase 2)Kantiya – Gwangar Yaya – Gwangar Dikko -Nasarawa- Faga7.7
54BM/RH Phase 2)Tangaza –Baidi3
55BM/RH Phase 2)Tangaza – Ruggar Ruwa – Tudure – Alela – Tudun Ruwa7.1
56BM/RH Phase 2)Tangaza Market – Belohe Spur Zabarma4.8
57BM/RH Phase 2)Adarawa – Kalenjeni0.9
58BM/RH Phase 2)Masallaci – Tungar Biyu – Wayage – Kaidaji10
59BM/RH Phase 2)Imasa Tasa – Imasa Gari1.2
60BM/RH Phase 2)Takalmawa – Ruggar Mode – Rumbuki – Gidan Tudu8
61BM/RH Phase 2)Huchi – Boyin Kabawa – Gidan Bubu8.7
62BM/RH Phase 2)Gumbi – Hamidawa1.1
63BM/RH Phase 2)Tabkin Gumbi – Gidan Gona0.7
64BM/RH Phase 2)Boye Junction – Gwamatse – Yar Tunga8.5
65BM/RH Phase 2)L G Secretariat – Dabagin Kwadde – Dabagin Dorayu Spur Sidingo4.5
66BM/RH Phase 2)Huchi – Gidan Kamba – Lugu Junction7.1
67BM/RH Phase 2)Wurno – Kwargaba – Sabon Gari9.5
68BM/RH Phase 2)Wurno – Tunga Kagara – Gidan Bango – Hamma Ali17.6
69BM/RH Phase 2)Munki – Tudun Bizo1.3
70BM/RH Phase 2)Munki – Gidan Mai Hatsi0.8
71BM/RH Phase 2)Gidan Inda – Gyal Gyal – Tudun Musa – Burmawa5.2
72BM/RH Phase 2)Gumburawa – Sisawa – Gidan Fako3.7
73BM/RH Phase 2)Achida – Tudun Mallame1.3
74BM/RH Phase 2)Jega Main Road – Mazaren Yamma0.3
75BM/RH Phase 2)Jega Main Road – Mazaren Gabas0.4
76BM/RH Phase 2)Yabo – Baware2